The data center building is designed to house a data processing center with the following key technical and economic indicators: a data center consisting of two modules with 90 / 90 rack spaces, respectively (a total of 180 IT racks), and a maximum electrical power consumption of up to 2.5 MW per module. The data center building includes an administrative and utility zone (office zone). The project provides for a set of technological solutions for the installation, cooling, power supply, and lighting of IT equipment in Module No. 1 and No. 2 of the data center. The maximum power consumption of IT equipment (hereinafter referred to as “IT power”) is 2508 kW: • 96 IT racks at 14 kW each; • 64 IT racks at 16 kW each; • 20 IT racks at 7 kW each.. The main IT equipment of the data center is located in the machine rooms (MR) and telecommunications rooms (MDA).
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in Ucell DC "First", other data centers in Tashkent or operated by Ucell ООО «COSCOM», please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Nearest Data Centers
The below data centers are located closest to Qibray Tumani , May MFY , May kuchasi 365a.