With a 30MVA power connection to the grid, this datacenter will offer approx. 18 MW IT load.
The project is designed to match a Tier 3 Level classification according to the Uptime Institute criteria.
Furthermore, the site is targeting an EN50600, certification, VK3 (German standard).
The planned RFS for phase 1 is Q4 2026.
This datacenter takes the evolution of the business into account and offers a hybrid design with a combination of water cooling for AI or HPC Loads and air cooling for classic IT loads.
The project is conceived with a high energy efficiency: PUE 1.2.
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in DCP Munich 1, other data centers in Munich or operated by Data Center Partners, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.