Project Meridien, located in Lagrange, Australia, is a proposed hyperscale data center with a maximum IT load of 1,000 MW (1 GW), intended for AI training and high-performance computing. The initial development stage is planned for 48 MW IT load, with subsequent stages reaching up to 1,000 MW. The facility will primarily feature single-storey data halls with modular capacity of approximately 12 MW IT per module. It will utilize a closed-loop liquid-cooling system, targeting a Power Usage Effectiveness (PUE) below 1.4. The data center is designed to operate independently of the state electricity grid and will have planned redundant fiber routes for network connectivity. Gingerah Energy, the developer, also states targets for Tier III availability, 99.999% availability, and a renewable-energy share of 82-99%+, depending on configuration.

Events
This data center has timeline events listed. Typically events are related to M&A history, rebranding, capacity expansions etc.
Oct 2026 - Stage Change
Gingerah Energy announces plans for 1GW data centre and renewable energy hub in Western Australia
- New Stage: Announced
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in Project Meridien, other data centers in Broome or operated by Gingerah Energy, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Nearest Data Centers
The below data centers are located closest to National Highway 1.
DistanceData CenterAddress
380.33 kmNEXTDC - PH1 Port Hedland17 Loreto Cct
552.44 kmNEXTDC - NE1 Newman96 Woodstock St
980.24 kmMitrakom Data Center (MDC) KupangJl. Fetor Foenay No. 8
1184.54 kmProject AresMurranji Station
1196.64 kmDXN - SDC Darwin27 Harvey St
1196.74 kmNEXTDC - D2 Darwin2-6 Ryko Court
1196.76 kmNEXTDC Darwin Campus2-8 Ryko Court
1196.81 kmNEXTDC - D1 Darwin2 Harvey Street
1197.34 kmDarwin International Cable Landing Station1 Conacher Stret
1199.2 kmBeetaloo Digital DC4Finn Rd
Gingerah Energy

Gingerah Energy

Data Center Operator at
Project Meridien
National Highway 1
Headquartered in South Perth, Australia

1