This data center may not be available

According to our data, this data center is currently listed as: Under Construction

Prometheus WY-1

Prometheus Hyperscale
8936 County Road 180
82930 Evanston
Wyoming, USA
Visit Website
Prometheus Hyperscale Logo

Suites
Cages
Footprints
Private Cabinets
Remote Hands


Prometheus’ Evanston WY flagship (“Project Torch”) is anchored on a ~12,000-acre ranch surrounding a utility substation, with 640 acres set aside for data center development (≈4,100 acres owned and ≈8,000 leased), and a multi-mile buffer with no nearby neighbors. The site is construction-primed (undisturbed land, no remediation, mining-scale earthmoving capability, completed geotech borings, and graded well pads).

On power, Prometheus and a Fortune 500 Independent Power Producer have partnered to deliver 1.2+ GW of reliable, on-site generation with a path to eventual grid interconnection; the buildout is staged to 150 MW by EOY 2027, 450 MW by EOY 2028, and 1.2 GW by EOY 2029, targeting ~99.9% reliability. The land position supports a tenant-directed evolution toward cleaner supply, including up to 1 GW of solar on the ranch, four adjacent wind farms, and an Oklo LOI for a 20-year, 100 MW nuclear PPA (incremental to the on-site program).

Fiber is built around the Northern transcontinental long-haul trunk (East–West), brought onto the campus via ROADMs (on-ramp) with up to 400G service agreements today and an 800G-capable long-haul path as switching matures; dark fiber is available, and 10 empty 2-inch interconnection ducts enable expansion up to ~17,280 pairs. Network diversity is emphasized (multiple providers, 3 physical networks / 5 routes), and Lumen’s analysis highlights hyperscaler-grade fabric compatibility and ~14ms round-trip latency to a West Coast data center.


Prometheus WY-1 - 220513 Rendering.jpg
Prometheus WY-1 - Data_Hall_Cross_Section_Rendering.png
Events
This data center has timeline events listed. Typically events are related to M&A history, rebranding, capacity expansions etc.
May 7, 2025 - PPA
Prometheus Hyperscale to power 1.2GW Wyoming data center with natural gas and carbon capture
- Phase Power: 1200 MW
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in Prometheus WY-1, other data centers in Evanston or operated by Prometheus Hyperscale, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Nearest Data Centers
The below data centers are located closest to 8936 County Road 180.
DistanceData CenterAddress
64.05 milesLumen Ogden 1526 W 17th Street
64.16 milesWebNX Ogden119 North 600 West, Bldg 3B
66.86 milesDataBank SLC1 - Downtown Salt Lake City179 E Social Hall Ave
67.27 milesXMission Data Center51 East 400 South
68.49 milesFlexential Salt Lake City - Fair Park Data Center118 South 10th West
69.79 milesFlexential Salt Lake City - Millcreek Data Center3949 South 200 East
70.46 milesFlexential Salt Lake City - Downtown Data Center572 South Delong Street
70.5 milesSyringa Networks West Valley1385 West 2200 South
72.32 milesLumen Salt Lake City 25035 Harold Gatty Drive
72.99 miles2302 South Presidents Drive2302 S Presidents Dr
Prometheus Hyperscale

Prometheus Hyperscale

Data Center Operator at
Prometheus WY-1
8936 County Road 180
Headquartered in Evanston, Wyoming