2015 - Phase Announced
DuPont Fabros expands ACC7 with 9MW and 50,000 sq ft
- Phase Power: 9 MW
- Phase Whitespace: 50000 sq. ft.
- Phase Power: 9 MW
- Phase Whitespace: 50000 sq. ft.
| Distance | Data Center | Address |
|---|---|---|
| 0.17 miles | 21745 Sir Timothy (ACC9) | 21745 Sir Timothy Dr |
| 0.17 miles | 44480 Hastings Drive (ACC4) | 44480 Hastings Drive |
| 0.21 miles | Equinix DC4 | 21691 Filigree Court |
| 0.22 miles | 44521 Hastings Drive (ACC5) | 44521 Hastings Drive |
| 0.26 miles | GDC - Ashburn VA3 Data Center | 21583 Megawatt Drive |
| 0.26 miles | Equinix DC5 | 21701 Filigree Court |
| 0.27 miles | 44461 Chilum Place (ACC6) | 44461 Chilum Place |
| 0.28 miles | Rackspace Ashburn | 44461 Chilum Place |
| 0.32 miles | Equinix DC1 | 21711 Filigree Court |
| 0.33 miles | 21744 Sir Timothy (ACC10) | 21744 Sir Timothy Dr |