IREN Childress Campus

IREN (Iris Energy)
620 Farm to Market Road 1033
79201 Childress
Texas, USA
Visit Website
IREN (Iris Energy) Logo



IREN Childress is a large-scale data center campus located on approximately 576 acres in Childress County, Texas. The campus has 750 MW of secured grid-connected power capacity, supplied through the ERCOT electricity network via a 345 kV transmission connection and associated high-voltage substations, including 345/138 kV transformation infrastructure. Operations began in April 2023, initially supporting Bitcoin mining, with the site now undergoing a major conversion to AI and high-performance computing infrastructure.

The campus development includes Horizon 1 through Horizon 4, four purpose-built, direct-to-chip liquid-cooled AI data center facilities providing a combined 200 MW of IT capacity, with 50 MW allocated to each Horizon. These facilities are designed for high-density NVIDIA GB300 GPU deployments, with rack densities of up to 200 kW, redundant electrical infrastructure, UPS systems, and diesel generator backup. The four facilities form part of a five-year, approximately $9.7 billion AI cloud services agreement with Microsoft.

Further expansion includes Horizons 5 and 6, representing an additional 150 MW of planned liquid-cooled data center capacity, alongside the conversion of existing air-cooled facilities for GPU computing. This includes a planned 60 MW deployment supporting NVIDIA AI workloads. The campus is being developed toward a total 750 MW gross power envelope, with phased construction and conversion of existing infrastructure. IREN reports 100% renewable-energy coverage for its operations, including through renewable energy certificates.

IREN Childress Campus - IREN Childress Data Center
IREN Childress Campus - Iris Energy - Childress Construction Update

This is a campus listing, that covers multiple data centers. Click below listings for further details:
Data CenterOperated ByDetails
IREN Horizon 10IREN (Iris Energy)
IREN Horizon 7IREN (Iris Energy)
IREN Horizon 1IREN (Iris Energy)
IREN Horizon 5IREN (Iris Energy)
IREN Horizon 9IREN (Iris Energy)
IREN Horizon 4IREN (Iris Energy)
IREN Horizon 8IREN (Iris Energy)
IREN Horizon 2IREN (Iris Energy)
IREN Horizon 6IREN (Iris Energy)
IREN Horizon 3IREN (Iris Energy)
Events
This data center has timeline events listed. Typically events are related to M&A history, rebranding, capacity expansions etc.
Nov 2025 - Lease
Microsoft secures $9.7bn cloud capacity deal with Iren for GPU access
Key/Anchor Tenant(s)

We have one or more tenants listed for this facility. Listed tenants are typically anchor or key tenants:

Microsoft - Tenant

Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in IREN Childress Campus, other data centers in Wichita Falls or operated by IREN (Iris Energy), please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
IREN (Iris Energy)

IREN (Iris Energy)

Data Center Operator at
IREN Childress Campus
620 Farm to Market Road 1033
Headquartered in Sydney, New South Wales

23