Cages
Private Cabinets
Partial Cabinets
On-Net Products
- IP Transit
- Ethernet Transport Services
Standard Rack Configuration
- 42U Cabinets (Type: APC AR3100)
- Power extra (1) 110v/20 amp or (2) 110v/20A is standard
Carrier Availability - In Data Center
- Verizon & Charter
Facilities
- 480v 3-phase utility feed - 3,000 amps
- 480v 3-phase utility feed - 2,500 amps
- 24,608 square feet of non-raised floor data center space
Security
- C*CURE Software House Card Reader Access Control System (11) card readers total at every essential door
- Entrances into actual data center areas requires HID card swipe and unique pin code for access
- (13) cameras tied into software with recording and 24/7 monitoring capabilities
- 24/7/365 Building Security need to sign in and show proper ID for access to the 6th floor.
UPS Systems
- (4) UPS Units - 400kVA each (Pillar UB R 400)
- A&B System - 2 UPS Units in "parallel" each
- Each UPS has (3) strings of batteries - 120 total
Generator Systems
- Caterpillar Diesel Generator - 1,500kW unit (Model 3512)
- 6,000 gallon diesel fuel storage tank
- Fuel Pump Transfer System
- "Tap Box" Connection in place for emergency portable generator use
Electrical
- ASCO Automatic Transfer Switch - 1,000 amps
- RussElectric Automatic Transfer Switch - 2,500 amps
- (4) United Power PDUs
Fire Systems:
- Pre-action & dry pipe sprinkler fire suppression systems
HVAC
- (15) 20-ton Liebert HVAC units with rooftop dry coolers for the data center and electrical area
- (2) 10-ton Stulz HVAC units with rooftop dry coolers for the data center
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in
Cogent Data Center - New York, other data centers in New York or operated by Cogent Communications, Inc., please try our
free quote service or reach out for a
free consultation about your data center needs.
Advertisement
Nearest Data Centers
The below data centers are located closest to
25 Broadway.