Edged is developing a 200MW data center campus in Council Bluffs, Iowa, under the project name “Project Lola.” Originally approved for two 80-foot-tall buildings totaling 900,000 sq ft, the plan has been scaled down to better align with customer requirements and site optimization. The revised design includes two 285,445 sq ft buildings, each standing 36 feet, 3 inches tall, along with an administrative building.
Instead of relying on a MidAmerican Energy substation, Edged will install two owner-operated substations, a switchyard, and overhead electric infrastructure to support the facility. Despite the reduced footprint, the total planned capacity remains at 200MW, maintaining the project's strategic significance.
This is a campus listing, that covers multiple data centers. Click below listings for further details:
If you are looking for colocation, cloud, connectivity or other services in Edged Council Bluffs Campus, other data centers in Council Bluffs or operated by Edged Energy, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Edged Energy
Data Center Operator at Edged Council Bluffs Campus College Rd and E Kanesville Blvd Headquartered in Darien, Connecticut