
CyrusOne Data Centers
Data Center Operator at
CyrusOne LON3 - Slough
700 Stirling Road
Site Code: LON3
Headquartered in Carrollton, Texas
CyrusOne LON3 - Slough
700 Stirling Road
Site Code: LON3
Headquartered in Carrollton, Texas
| Fully Built-Out Power | 9 MW |
| Fully Built-Out Whitespace | 3,600 sq.m. |
| Full Cabinets | |
| Partial Cabinets | |
| Shared Rackspace | |
| Cages | |
| Suites | |
| Build-to-Suit | |
| Footprints | |
| Remote Hands |
| UPS Description: Distributed redundant UPS topology with 10-minute battery | |
| Cooling Description: N+1 Indirect Adiabatic Air Cooled solution as standard | |
| Standby Power Description: Fully rated distributed redundant LV back-up generators with 48-hour fuel |
| Tier Design | Tier 3 |
| DSS PCI Certified | |
| ISO27001 Certified | |
| ISO9001 Certified | |
| ISO14001 Certified |
| Fenced Perimeter | |
| Mantrap Entry | |
| CCTV surveillance | |
| Biometric Access Control | |
| Card Access Control | |
| Automatic Firesupression | |
| Firesupression System: VESDA (Very Early Smoke Detection Apparatus) | |
| Floor to Ceiling Height | 340 cm |
| Meet-Me-Room (MMR) | |
| Loading Bay |
| Peering networks | 1 |
LON3 Spec Sheet |