This data center may not be available

According to our data, this data center is currently listed as: Under Construction

Datum London FRN2

Datum Datacentres Ltd
Cody Technology Park
Ground Floor
GU140LX Farnborough
United Kingdom
Visit Website
Datum Datacentres Ltd Logo

4 MW
22,000 sq.f.
Capacity
Fully Built-Out Power4 MW
Fully Built-Out Whitespace22,000 sq.f.
Services
Full Cabinets
Partial Cabinets
Shared Rackspace
Cages
Suites
Build-to-Suit
Footprints
Remote Hands
Power
Max power/rack3.5 kW
UPS Redundancy2N
Cooling Redundancy2N
Standby Power Redundancy2N
Compliance
Tier DesignTier 3
DSS PCI Certified
ISO27001 Certified
ISO9001 Certified
ISO14001 Certified
ISO50001 Certified
Security
CCTV surveillance
Biometric Access Control
Card Access Control
Automatic Firesupression
Firesupression System: fire extinguishant with double knock detection and VESDA early warning system
Onsite Security StaffYes, 24/7
Building
Construction TypePurpose-built
Amenities
No data supplied by Datum Datacentres Ltd
Statistics
No data supplied by Datum Datacentres Ltd
Downloads
Advertisement

Sales Team
Datum Datacentres Ltd









Datum Datacentres Ltd

Datum Datacentres Ltd

Data Center Operator at
Datum London FRN2
Cody Technology Park
Site Code: FRN2
Headquartered in Farnborough, Hampshire

4