
CyrusOne Data Centers
Data Center Operator at
CyrusOne MAD1 - Alcobendas
C. de El Nevero
Site Code: MAD1
Headquartered in Carrollton, Texas
CyrusOne MAD1 - Alcobendas
C. de El Nevero
Site Code: MAD1
Headquartered in Carrollton, Texas
| Fully Built-Out Power | 18 MW |
| Fully Built-Out Whitespace | 6,000 sq.m. |
| Full Cabinets | |
| Partial Cabinets | |
| Shared Rackspace | |
| Cages | |
| Suites | |
| Build-to-Suit | |
| Footprints | |
| Remote Hands |
| UPS Description: • Block redundant UPS topology with 10-minute battery back-up | |
| Cooling Description: Cooling configured on a resilient ring chilled water system | |
| Standby Power Description: Fully rated LV back-up redundant generators with 48-hour fuel |
| Tier Design | Tier 3 |
| ISO27001 Certified | |
| ISO9001 Certified | |
| ISO14001 Certified |
| Fenced Perimeter | |
| Mantrap Entry | |
| CCTV surveillance | |
| Biometric Access Control | |
| Card Access Control | |
| Automatic Firesupression | |
| Firesupression System: VESDA (Very Early Smoke Detection Apparatus) in data halls | |
| Onsite Security Staff | Yes, 24/7 |
| Floor Type | Raised Floor |
| Meet-Me-Room (MMR) | |
| Loading Bay |
| No data supplied by CyrusOne Data Centers |
MAD1 Spec Sheet |