2001 - Stage Change
Acens Alcobendas Data Center goes into operation in 2001.
- New Stage: Operational
- New Stage: Operational



| Distance | Data Center | Address |
|---|---|---|
| 0.71 km | Prime Madrid | Calle de la Pedriza 1 |
| 0.87 km | Equinix MD3x | C. de la Pedriza, 5-12 |
| 0.88 km | Equinix MD4x | C. de la Pedriza, 5-12 |
| 0.93 km | Equinix MD6 | C. de la Pedriza, 5-12 |
| 0.96 km | Equinix MD5 | C. de la Pedriza, 5-12 |
| 0.96 km | CyrusOne MAD1 - Alcobendas | C. de El Nevero |
| 1.44 km | DATA4 Madrid - MAD1 | Avenida de la Industia, 15 |
| 1.53 km | Equinix MD2 | Valgrande, 6 |
| 1.74 km | Equinix MD1 | c/Isabel Colbrand, 6-8 |
| 1.79 km | Masmovil Madrid | María Tubau, 8 |