Ehost Internet Data Center in LG CNS Building:

Carrier Neutral

1. Building outline

- Construction commenced : 2009
- Scale : 1 underground floor, 13 above ground floors
- Site area : 14,946 m2
- Floor area : 75,041 m2
- Machine Room area : 12,060 m2

2. Characteristics

- Earthquake resistant design : up to 7.0 on the Richter scale
- Exclusive power supply for both main and reserve power, redundant backup power system
- Modular/tailored facility environment and green IT solution application

3. Earthquake facilities

- Resistant to up to 0.2g of seismic acceleration : Richter scale 7.0

4. Flooding (tsunamis, floods)

- Located in a safe zone away from risk inducing structures (Digital City)
- Located in a flood safe zone (7m above water level)

5. Power supply method

- Redundant supply line from Korea Electric Power Corporation
- Direct connection to the substation forlarge-scale power distribution (exclusive line)
- Physical separation of incoming lines and pipes
- Redundant ALTS and MOF high voltage lines
- Backup high voltage transformers installed
- Transformer and UPS N+1 methodology

6. UPS and emergency power generation

- Redundant exclusive UPS and physically redundant lines
- Emergency power generator

7. Cooling systems

- Main supply : Cooling tower
- Backup supply : Emergency distributed cooling source in 8 areas for a distributed vertical conduit system
- Redundant coolant circulation pump and coolant supply conduits
- Efficient management of the fan inverter control

8. Isothermal-humidity system

- Some of the thermo-hygrostats installed in the computer rooms are designed to admit outdoor air during winter, reducing power consumption for cooling and realizing a green data center.
- Format : Water-cooled
- Humidification : Separate humidifiers
- Backup thermo-hygrostats

9. Central air

- Cool and hot zones are separately designated, and separate partitions are installed in cool zones to block flow of cool air. This centralized cooling design promotes power saving.
- Servers separated for each customer(separate cool & hot zones).
- Grill vents are arranged in cool zones for air conditioning.
- Separate partitions are installed for containment of cool airflow.
- Temperature sensors are installed in cool zones for cooling facilities.

10. Building security systems

- Bulletproof film on all first floor outside windows
- Glass damage sensors
- Fire detection systems (state of the art CCTV)
- Bollards (posts) installed to prevent unauthorized vehicle entry

11 Entry/exit control system

- Lobby entry/exit control
- Constant security staff presence and speed gate
- Lockers to store valuables
- Entry/exit control for the computer room : Interlocking Door (primary biometric recognition system, secondary weight sensor)
- Integrated security office operations

12. Vehicle control system

- Control of incoming cars through security staff
- Entry/exit control through RF Tags
- Roadblocks (control of cars entering throughthe exits)
- Operation of elevators exclusively for vehicle drivers


EhostIDC LOGO
Data Center
EhostIDC Datacenter
Part of LG Gasan Digital Center

This profile is a sublisting to the datacenter listing LG Gasan Digital Center.
- Click here to view the profile for LG Gasan Digital Center

EhostIDC Pricing
If you are looking for colocation, cloud, connectivity or other services in EhostIDC, or other data centers in Seoul or by EhostIDC, please try our free quote service or reach out for a free consultation about your data center needs.
Advertisement
Nearest Data Centers
DistanceData CenterAddress
0 kmKINX Gasan Center3F, 189, Gasan digital 1-ro
0 kmLG Gasan Digital CenterGasan Digital 1-ro 189
3.45 kmSK broadband6, Beobwon-ro 1-gil, Seocho-gu, Seoul, 06595, Rep. of KOREA
5.23 kmKT Mokdong 1st DC924-4 Mokdong YangChunGu
5.4 kmKT Mokdong 2nd DC323 Mokdongdong-ro, Yangcheon-Gu
5.6 kmKT Yeouido DC14, Yeoui-daero, Yeongdeungpo-gu
11.03 kmKINX Sangam CenterLG CNS Sangam IT Center, 424, World Cup buk-ro
11.11 km1588 Sangam-Dong (ICN10)1588 Sangam-Dong
11.25 kmEquinix SL124, Worldcupbukro 60-gil, Samsung SDS SangAm IT Center
12.58 kmSTT Seoul 1TBA - To be announced

EhostIDC
Data Center Operator at
EhostIDC
Gasan Digital 1-ro 189
Headquartered in Seoul, Seoul

1