Goznak.Tech’s Moscow data center is a Tier III Facility-certified site engineered for high availability, physical security, and mission-critical workloads. Located in central Moscow, the facility spans 2,420 square meters and features 11 data halls with a total capacity of 370 racks and 5.2 megawatts of power.
The data center prioritizes resilience and security. Power infrastructure includes 2N redundancy for rack power, N+1 UPS systems, and N+1 diesel generators. It supports both single- and three-phase rack connections with capacity ranging from 5kW to 11kW per rack, including high-density configurations.
Cooling is handled by precision freon-based air conditioners in an N+1 configuration, maintaining strict environmental conditions: 25°C ±2°C and humidity between 30–70%.
Security is multilayered with 24/7 armed guards, triple perimeter barriers, video surveillance, access control systems, and mantraps at each zone entry. Customers may request additional measures such as customized enclosures, extra cameras, or biometric access controls.
Fire protection is ensured via automatic gas-based suppression systems using Halon 125. The facility offers scalable colocation options for enterprises, including optional enhancements to match stringent compliance or operational needs.