Asterion Industrial Partners
Data Center Operator at
MEO Covilha
Transversal Rua da Grila 4
Headquartered in Madrid, Spain
MEO Covilha
Transversal Rua da Grila 4
Headquartered in Madrid, Spain
| Fully Built-Out Power | 75 MW |
| Live Power | 6.8 MW |
| Fully Built-Out Whitespace | 12,000 sq.m. |
| Total Building Size | 75,500 sq.m. |
| Full Cabinets | |
| Partial Cabinets | |
| Shared Rackspace | |
| Cages | |
| Suites | |
| Build-to-Suit | |
| Footprints | |
| Remote Hands |
| Max power/area | 2.2 kW/sq.m. |
| UPS Redundancy | N+1 |
| Cooling Redundancy | N+1 |
| Standby Power Redundancy | N+1 |
| Tier Design | Tier 3 |
| Tier Certification | Tier 3 |
| ISO27001 Certified | |
| LEED Gold |
| CCTV surveillance | |
| Biometric Access Control | |
| Card Access Control | |
| Automatic Firesupression | |
| Firesupression System: IG-55 (50 % Argon/ 50 % Azoto) | |
| Onsite Security Staff | Yes, 24/7 |
| Onsite Technical Staff | Yes, 24/7 |
| Year Operational | 2013 |
| Max Floor Load | 2500 kg/sq.m. |
| Meet-Me-Room (MMR) | |
| Conference Room | |
| Office Space |
| No data supplied by Asterion Industrial Partners |