2022 - M&A - Lumen Lima
Lumen sold its data centers in Latin America to Stonepeak in 2022, who used the assets to form Cirion.

| Distance | Data Center | Address |
|---|---|---|
| 0.21 km | Equinix LM1 | Calle Centauro 115, Los Granados |
| 0.45 km | NextStream Monterrico | Cruz Del Sur 137 |
| 4.08 km | GTD Surco | C. Enrique Villanueva 105 |
| 4.2 km | NextStream Lince | Jirón Manuel Candamo 441 Lince |
| 4.35 km | WIN DC Galvez | Avenida José Gálvez Barrenechea 535 |
| 4.91 km | WIN DC Santa Catalina | Av. Sta. Catalina 663 |
| 5.37 km | IPTP San Isidro | Golondrinas 114 |
| 10.14 km | InterNexa Lima | Avenida Pedro Miotta 421 |
| 13.52 km | Claro Data Center Villa El Salvador | Av. El Sol 2246 |
| 24.8 km | GTD Lurin | P5VF+2Vg |