Currently available for pre-sale and scheduled for general availability in Q4 2025, Cirion’s Lima 2 data center (LIM2) is designed to be one of the most advanced and high-density digital infrastructure facilities in Latin America. Located in Lima, this newly constructed, single-story reinforced-concrete facility will deliver over 2,800 m² of raised-floor space and is engineered for scale, performance, and operational excellence. LIM2 will feature Cirion’s highest cabinet density to date — up to 9.8 kW per rack — along with N+N (2N+2C) power redundancy, N+1 cooling, and a water mist fire suppression system for enhanced protection. With nine utility feeders, robust standby power architecture, and 100% renewable hydroelectric energy, the site is purpose-built for modern, high-availability workloads. Full integration with Cirion’s interconnection and compute services ensures flexibility, cloud access, and future growth
This data center has timeline events listed. Typically events are related to M&A history, rebranding, capacity expansions etc.
Jun 2023 - Stage Change
Cirion begins construction of its new LIM2 data center in MacrOpolis, Lurín, Peru, in June 2023 - New Stage: Under Construction
Q4 2025 - Stage Change
Cirion's LIM2 data center in Lurín, Peru, begins operations in Q4 2025 - New Stage: Operational
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in Cirion LIM2, other data centers in Lima or operated by Cirion, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Nearest Data Centers
The below data centers are located closest to Mártir Olaya S/N, Ciudad Industrial Macrópolis.