The CloudHQ QRO Campus is located close to the Queretaro airport (QRO), and will support a total critical load of 288 MW. The campus is located on a 518,470 m2 plot.

The campus is also known as the Colón Datacenter Complex.

The data center campus will consist of 6 buildings with 48 MW of critical power each, powered by an on-site substation.

- QRO1: 48 MW critical power + 454,340 square feet / 42,209 square meters
- QRO2: 48 MW critical power + 454,340 square feet / 42,209 square meters
- QRO3: 48 MW critical power + 454,340 square feet / 42,209 square meters
- QRO4: 48 MW critical power + 454,340 square feet / 42,209 square meters
- QRO5: 48 MW critical power + 454,340 square feet / 42,209 square meters
- QRO6: 48 MW critical power + 454,340 square feet / 42,209 square meters

Construction is due to begin no later than the first quarter of 2024 and is expected to generate more than 600 full time jobs, along with 1250 temporary jobs during construction.

This is a Campus listing, that covers multiple data centers. Click below for further details:
Data CenterOperated ByDetails
CloudHQ QRO3CloudHQ
CloudHQ QRO5CloudHQ
CloudHQ QRO1CloudHQ
CloudHQ QRO2CloudHQ
CloudHQ QRO4CloudHQ
CloudHQ QRO6CloudHQ

CloudHQ QRO Campus Pricing
If you are looking for colocation, cloud, connectivity or other services in CloudHQ QRO Campus, or other data centers in Queretaro or by CloudHQ, please try our free quote service or reach out for a free consultation about your data center needs.
Advertisement

CloudHQ
Data Center Operator at
CloudHQ QRO Campus
Carretera Estatal No.100, El Colorado-Higuerillas
Site Code: QRO 100, north side
Headquartered in Washington, District of Columbia

55