Jun 2025 - Phase Operational
A modular building has been installed in the data center, adding approximately 300 racks worth of capacity and around 2000 sqm of floor area to the campus.
- Phase Whitespace: 2000 sq. m.
- Phase Cabinets: 300 racks
- Phase Whitespace: 2000 sq. m.
- Phase Cabinets: 300 racks

