GDC - Noida 2 Data Center
Visit Website52.8 MW
27,871 sq.m.
Est. 2024
Capacity
Fully Built-Out Power | 52.8 MW |
Live Power | 22.4 MW |
Planned Power | 30.4 MW |
Fully Built-Out Whitespace | 27,871 sq.m. |
Services
Full Cabinets | |
Partial Cabinets | |
Shared Rackspace | |
Cages | |
Suites | |
Build-to-Suit | |
Footprints | |
Remote Hands |
Power
UPS Redundancy | 2N |
UPS Description: Dual UPS systems (A- and B-supply) | |
Cooling Redundancy | N+2 |
Cooling Description: Air-cooled chillers with continuous cooling; thermal storage tanks. |
Compliance
Tier Design | Tier 3 |
DSS PCI Certified | |
ISO27001 Certified | |
ISO50001 Certified |
Security
Fenced Perimeter | |
Mantrap Entry | |
CCTV surveillance | |
Biometric Access Control | |
Card Access Control | |
Automatic Firesupression | |
Firesupression System: NOVEC 1230 gas based fire suppression system | |
Onsite Security Staff | Yes, 24/7 |
Onsite Technical Staff | Yes, 24/7 |
Building
Year Operational | 2024 |
Tenancy Type: Multi-tenant (mixed use) | |
Construction Type | Purpose-built |
Amenities
Meet-Me-Room (MMR) |
Statistics
Peering networks | 3 |
Downloads
GDC_Factsheet_DEL2_EN.pdf |
Advertisement