GDC - Bengaluru 3 Data Center
Visit Website12 MW
5,800 sq.m.
Capacity
| Fully Built-Out Power | 12 MW |
| Fully Built-Out Whitespace | 5,800 sq.m. |
Services
| Full Cabinets | |
| Partial Cabinets | |
| Shared Rackspace | |
| Cages | |
| Suites | |
| Build-to-Suit | |
| Footprints | |
| Remote Hands |
Power
| UPS Description: PDUs supplied by N+N redundant UPS backed by batteries located on same floor | |
| Cooling Redundancy | N+2 |
| Cooling Description: Air cooling system with N+2 redundant configuration and bottom-up air supply. | |
| Standby Power Redundancy | N+2 |
| Standby Power Description: N+2 redundancies for transformers and generators for concurrent maintenance | |
Compliance
| No data supplied by NTT DATA, Inc. |
Security
| CCTV surveillance | |
| Biometric Access Control | |
| Card Access Control | |
| Automatic Firesupression | |
| Firesupression System: Auto disabling of access control and release of fire suppression gas in case of fire detection | |
| Onsite Security Staff | Yes, 24/7 |
Building
| Building Floors | 8 |
Amenities
| Meet-Me-Room (MMR) |
Statistics
| Peering networks | 2 |
Downloads
Bengaluru 3 Data Center |
Advertisement

