This data center may not be available
According to our data, this data center is currently listed as: Under Construction
| Fully Built-Out Power | 67.2 MW |
| Under Construction Power | 22.4 MW |
| Fully Built-Out Whitespace | 17,000 sq.m. |
| Full Cabinets | |
| Partial Cabinets | |
| Shared Rackspace | |
| Cages | |
| Suites | |
| Build-to-Suit | |
| Footprints | |
| Remote Hands |
| Max power/rack | 5 kW |
| UPS Redundancy | 2N |
| UPS Description: Dual UPS systems (A- and B-supply) | |
| Cooling Redundancy | N+2 |
| Cooling Description: Highly efficient air-cooled chiller systems | |
| Tier Design | Tier 3 |
| Fenced Perimeter | |
| Mantrap Entry | |
| CCTV surveillance | |
| Biometric Access Control | |
| Card Access Control | |
| Automatic Firesupression | |
| Firesupression System: NOVEC 1230 gas based fire suppression system | |
| Onsite Security Staff | Yes, 24/7 |
| Year Operational | 2025 |
| Tenancy Type: Multi-tenant (mixed use) | |
| Construction Type | Purpose-built |
| Meet-Me-Room (MMR) | |
| Breakroom | |
| Loading Bay |
| No data supplied by NTT DATA, Inc. |
Bengaluru 4 Data Center fact sheet |