GDC - Tai Po Data Center
Visit Website9.9 MW
5,000 sq.m.
Capacity
| Fully Built-Out Power | 9.9 MW |
| Fully Built-Out Whitespace | 5,000 sq.m. |
| Total Building Size | 20,000 sq.m. |
Services
| Full Cabinets | |
| Partial Cabinets | |
| Shared Rackspace | |
| Cages | |
| Suites | |
| Build-to-Suit | |
| Footprints | |
| Remote Hands |
Power
| PUE | 1.7 |
| UPS Redundancy | 2N |
| Cooling Redundancy | N+1 |
| Cooling Description: N+1 (water cooled and air cooled) chiller | |
| Standby Power Redundancy | N+1 |
| Standby Power Description: N+1 prime rating generator | |
Compliance
| Tier Design | Tier 3 |
| DSS PCI Certified | |
| ISO27001 Certified | |
| ISAE3402 Type 1 Certified | |
| ISO9001 Certified |
Security
| Mantrap Entry | |
| CCTV surveillance | |
| Biometric Access Control | |
| Card Access Control | |
| Onsite Security Staff | Yes, 24/7 |
| Onsite Technical Staff | Yes, 24/7 |
Building
| Tenancy Type: Sole-tenant | |
| Construction Type | Purpose-built |
| Building Floors | 7 |
Amenities
| Conference Room |
Statistics
| Peering networks | 14 |
| Network providers | 1 |
Downloads
Hong Kong Data Centers borchure |
Advertisement

