This data center may not be available

According to our data, this data center is currently listed as: Planned

Karatzis Group Kastro

Karatzis Group
PATHE Motorway (E75)
322 00 Kastro
Greece
Visit Website
Karatzis Group Logo



The Karatzis Group is undertaking a substantial €240 million data center development in Kastro, Greece, located in the Municipality of Orchomenos, approximately 100 km northwest of Athens. This expansive campus, situated off the PATHE (E75) motorway on the Ampelia site, will feature seven distinct data center buildings. Upon full buildout, the facility is projected to offer a total power capacity of 430MW, with each individual building designed for a 61.49MW load. The project encompasses 342,465 sqm (3.68 million sq ft) of space. Design and initial studies commenced in 2025. Construction is planned in three stages over 18 months, focusing on site preparation, infrastructure, and equipment installation. The data center is strategically located outside heritage and archaeologically sensitive zones, aligning with Greece's growing investment in data infrastructure to meet increasing demand for low-latency connectivity within the Mediterranean region and the EU.


This is a campus listing, that covers multiple data centers.
Events
This data center has timeline events listed. Typically events are related to M&A history, rebranding, capacity expansions etc.
Mar 2026 - Stage Change
Karatzis Group announces €240m data center in Boeotia, Greece
- New Stage: Announced
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in Karatzis Group Kastro, other data centers in Orchomenus or operated by Karatzis Group, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Karatzis Group

Karatzis Group

Data Center Operator at
Karatzis Group Kastro
PATHE Motorway (E75)
Headquartered in Heraklion, Greece

View