This data center may not be available

According to our data, this data center is currently listed as: Planned

Azur Datacenter - Béthune

Azur Datacenter
575 Av. George Washington
62400 Béthune
France
Visit Website
Azur Datacenter Logo

Suites
Cages
Private Cabinets
Partial Cabinets
Remote Hands


Azur Datacenter - Béthune, located at 575 Av. George Washington in Béthune, France, is a significant new data center project focused on artificial intelligence (AI) and high-performance computing (HPC). This facility is being established on the former Bridgestone industrial site, with a substantial investment of 1.5 billion euros. The data center will occupy a 26,000 m² rehabilitated building, designed to accommodate very high-capacity servers for massive data storage and processing.

The infrastructure is "liquid-ready," supporting direct liquid cooling (DLC) and immersion cooling technologies, which are crucial for efficiently dissipating heat from dense AI/HPC hardware. This design enables higher power density per rack and aims for significant energy consumption reduction. The site benefits from its industrial heritage, offering advantages such as easy access for heavy vehicles, pre-existing or easily connectable electrical infrastructure, and essential technical services. The project is scheduled for commissioning in early 2026 and is expected to create around thirty jobs. It aligns with the regional ambition to become a leading "AI Valley" in France, leveraging the country's low-carbon energy grid.

Events
This data center has timeline events listed. Typically events are related to M&A history, rebranding, capacity expansions etc.
Sep 16, 2025 - Stage Change
Azur Datacenter acquired a former Bridgestone manufactoring site with plans to redevelop it into an AI-Ready data center
- New Stage: Announced
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in Azur Datacenter - Béthune, other data centers in Lille or operated by Azur Datacenter, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Nearest Data Centers
The below data centers are located closest to 575 Av. George Washington.
DistanceData CenterAddress
25.42 kmEXA Lille126 Rue Carnot
26.62 kmKyndryl DC Seclin14 Rue de Lorival
27.22 kmoXya Loos3 Rue de Londres
29.54 kmLa Poudrière Numérique187 allée du Général de Gaulle
29.77 kmTDF Datacenter Lille Lambersart251 Avenue du Bois
29.85 kmLEntrepôt Numérique2 rue François Hennebique
32.52 kmCogent Data Center - Lille72 rue Jenner
32.7 kmComarch Lille17 rue Paul Langevin
34.12 kmOgreen DataCenter15 Rue Jules Lammens
34.12 kmETIX Lille #428 Rue des Famards
Azur Datacenter

Azur Datacenter

Data Center Operator at
Azur Datacenter - Béthune
575 Av. George Washington
Headquartered in Croissy-Beaubourg, France

4