
Equinix
Data Center Operator at
Equinix HE2
Kanavaranta 5
Site Code: HE2
Headquartered in Redwood City, California
Equinix HE2
Kanavaranta 5
Site Code: HE2
Headquartered in Redwood City, California
| Fully Built-Out Power | 1 MW |
| Fully Built-Out Whitespace | 270 sq.m. |
| Full Cabinets | |
| Partial Cabinets | |
| Shared Rackspace | |
| Cages | |
| Suites | |
| Build-to-Suit | |
| Footprints | |
| Remote Hands |
| Max power/area | 15 kW/sq.m. |
| Tier Design | Tier 2 |
| ISO27001 Certified |
| No data supplied by Equinix |
| Year Operational | 2010 |
| Tenancy Type: Multi-tenant (mixed use) | |
| Construction Type | Retrofitted |
| Meet-Me-Room (MMR) |
| Network providers | 5 |