Greenergy Data Centers Tallinn DC-1

Greenergy Data Centers
Alajaama tee 1
76911 Hüüru küla, Saue vald, Harjumaa
Harjumaa, Estonia
Visit Website
Greenergy Data Centers Logo

31.5 MW
3,500 sq.m.
Est. 2022
Capacity
Fully Built-Out Power31.5 MW
Fully Built-Out Whitespace3,500 sq.m.
Total Building Size14,500 sq.m.
Services
Full Cabinets
Partial Cabinets
Shared Rackspace
Cages
Suites
Build-to-Suit
Footprints
Remote Hands
Power
Max power/rack20 kW
Max power/area2.2 kW/sq.m.
PUE1.2
UPS RedundancyN+1
UPS Description: UPS'es with batteries
Cooling RedundancyN+1
Cooling Description: Free cooling with chilled water closed circuit and partial load CGM’s
Standby Power RedundancyN+1
Standby Power Description: Diesel generators
Compliance
Tier DesignTier 3
Tier CertificationTier 3
DSS PCI Certified
ISO27001 Certified
EN50600 Certified
ISO9001 Certified
Security
Fenced Perimeter
Mantrap Entry
CCTV surveillance
Biometric Access Control
Card Access Control
Automatic Firesupression
Firesupression System: Low oxygen fire prevention and gas supression
Onsite Security StaffYes, 24/7
Onsite Technical StaffYes, 24/7
Building
Year Operational2022
Tenancy Type: Multi-tenant (mixed use)
Construction TypePurpose-built
Whitespace expandable
Roof Access
Building Floors3
Floor TypeMixed
Floor to Ceiling Height600 cm
Amenities
Meet-Me-Room (MMR)
Conference Room
Breakroom
Office Space
Loading Bay
Crash Cart(s)
Loaner Tools
WiFi
Parking Available: Yes
Statistics
Peering networks6
Network providers10
Downloads
Onepager
Colocation
Advertisement

Aleksandr Švadtšenko
Head of International Markets
Greenergy Data Centers









Greenergy Data Centers

Greenergy Data Centers

Data Center Operator at
Greenergy Data Centers Tallinn DC-1
Alajaama tee 1
Headquartered in Hüüru küla, Saue vald, Harjumaa, Harju

1