Guangzhou data center is located 43 km/27 mi from Guangzhou Baiyun International Airport (CAN).
Area:15,000 sq.m.
SLA: 99.999%+ Power availability 99.999%+ Temperature and humidity availability 99.99%+ Cross connect availability
Specifications: -Electrical capacity - 2.4 kVA per cabinet -UPS configuration - N+1 redundancy -Two-line 10 kV class 1 mains supply from Gaotang and Yushu substations (completed for ---Gaotang substation and under construction for Yushu substation) -Equipped with 6 2000kva transformers -Four 2000 kW Caterpillar diesel generators -Four 1000L daily fuel tanks and one 15000L underground tank -A fuel supply agreement signed with a local petrol station ensures the supply of fuel -Five 800KVA UPS systems (Phase 1), including 2 1+1 systems on 1F and 3 2+1 systems on 3F -All racks use dual channels, with a maximum load per channel of 32A -Each UPS system is equipped with a separate battery pack, which can provide 30 minutes of uninterrupted power supply -Three 300 ton of refrigeration and three 600 ton of refrigeration Trane chillers -31 CRACs on 1F and 3F -The lower air supply and upper air return refrigeration mode is used to maintain the IDC's temperature between 22´-26´
Security: 24x7 onsite security guards IC cards are used to control all areas and card swiping records are retained for one year All areas are CCTV-monitored and video recordings are retained for one month
Certifications: Built to Tier 4 specifications ISO/IEC 27001 Class 1 fire-resistant building design and magnitude 8 earthquake resistance
Guangzhou Pricing/Quotes
If you are interested in receiving a quote for Zenlayer, please try our free quote service.