STACK's TOR01 campus in Toronto, Canada, is a 56MW facility designed for scalable deployments, including an initial 8MW data center and two 24MW expansion phases. Situated on 19 acres, the campus boasts 592,000 sq. ft. and supports both shell and turnkey builds.
Strategically located minutes from downtown Toronto and Canada's largest carrier hotel, 151 Front Street, TOR01 offers expansive connectivity. The campus is powered by 100% renewable energy from three diverse substations of Toronto Hydro, ensuring reliable and redundant zero-carbon energy. It features dual utility feeds with N and optional N+1 block redundancy, minimum 24-hour fuel storage, and client-dedicated PDU distribution.
The facility is engineered for high-density flexibility, supporting advanced cooling solutions like liquid to chip and closed-loop water cooling for AI workloads. Security is paramount with 24/7 on-site personnel, dual-factor biometric access, comprehensive CCTV, and a secure perimeter. Amenities include conference rooms, WiFi, office space, and loading docks. The campus includes two Main Distribution Frames with diverse fiber entrances for robust connectivity.
Campus BrochureThis is a campus listing, that covers multiple data centers. Click below listings for further details:
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in
STACK Infrastructure TOR01 Campus, other data centers in Toronto or operated by STACK INFRASTRUCTURE, please try our
free quote service or reach out for a
free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement