This data center may not be available
According to our data, this data center is currently listed as: Canceled
| Fully Built-Out Power | 1000 MW |
| Fully Built-Out Whitespace | 1300000 sq.f. |
| Total Building Size | 2000000 sq.f. |
| No data supplied by Synapse Data Center |
| Max power/rack | 20 kW |
| PUE | 1.2 |
| UPS Redundancy | N+1 |
| Cooling Redundancy | N+1 |
| Cooling Description: Aircooled, free cool chillers | |
| Standby Power Redundancy | N+1 |
| No data supplied by Synapse Data Center |
| Fenced Perimeter | |
| Mantrap Entry | |
| CCTV surveillance | |
| Biometric Access Control | |
| Automatic Firesupression | |
| Firesupression System: Double interlock pre-action dry pipe | |
| Onsite Security Staff | Yes, 24/7 |
| Onsite Technical Staff | Yes, 24/7 |
| Year Operational | 2026 |
| Construction Type | Purpose-built |
| Building Floors | 1 |
| Max Floor Load | 2500 Lb/sq.f. |
| Meet-Me-Room (MMR) | |
| Loading Bay |
| No data supplied by Synapse Data Center |
No files available |