Data Center Map

ByteGrid Silver Spring/DC Metro


» Index » USA » Maryland » Silver Spring » ByteGrid Silver Spring/DC Metro

ByteGrid Silver Spring/DC Metro is located in the area Silver Spring, USA (America), and the colocation data center is carrier neutral. The data center was last updated on 15-08-2016.


Address:
ByteGrid
12401 Prosperity Drive
20904 Silver Spring
Maryland, USA

» Request quote
» Visit website

Click here to find other data centers
owned and operated by ByteGrid.


Profile
Map
Tenants
Connectivity
Request quote
Office space
Rack Cabinets
Dedicated Servers
Suites
Footprints
Virtual Servers
Cages
Hosting of individual servers
Remote Hands

Profile


ByteGrid's Silver Spring campus is strategically located at the heart of the Washington Metropolitan region ideally suited to support national and local (DC, southern Maryland and northern Virginia) markets. This proven data center was designed and purpose-built for "financial grade" concurrent maintainability with flexibility, agility and resiliency in mind to support an array of IT loads, compute applications and solutions including production, cloud computing, storage, business continuity and disaster recovery. The facility is positioned to support both single or multi-tenant requirements in N+2 and/or N+1 configurations capable of over 150 watts per square foot densities. Move-in ready 30" raised floor PODs are available in 5,000 to 36,000 square foot increments supported by best-of-class electrical, mechanical, security and facilities systems and personnel.

ByteGrid's regional campus is equipped with 2N electrical utility service and redundant and
diverse telecommunications infrastructure from the industry leading carriers. Modular container pads are also available for lease. This premier data center has processed trillions of dollars of daily transactions with zero downtime.

214,000 ft2, 2-story facility with detached tape storage bunker on an 11-acre ultra-secure campus.

90,000 ft2 of conditioned 30" raised computer room floor with 25,000 ft2 expansion space, 20,000 ft2 of technical office space, and capacity for high density computing containers.

"Financial grade" infrastructure resiliency meets Tier IV requirements of concurrent maintainability and fault tolerance.

Physical security meets GSA ISC Level IV standards and network grid connectivity criteria.

2N electrical utility N+2 UPS power N+2 generators N+1 mechanical design N+2 HVAC units.

Key Facility Features:

New electrical and mechanical infrastructure

9 megawatts of uninterruptable power supply installed in an N+2 and N+1 configuration

22 megawatts of prime rated generator capacity

5 Piller uniblock rotary 1.8 megawatt UPS systems

Four 25,000 gallon underground fuel storage tanks sized for 72 hours at full load

3,250 tons of chilled water capacity

Fiber data connectivity from five network providers via four diverse paths

Preaction, VESDA, Clean Agent fire protection

Robust physical security with 8' ram-proof perimeter fencing, jersey barriers, man-traps, card readers, eye scanners and video camera surveillance system

State-of-Art tape storage platform with capacity for over 500,000 tapes

Hardened structure to withstand 125 mile per hour winds and local seismic
conditions

LEED Gold New Construction Certified


ByteGrid Silver Spring/DC Metro Pricing/Quotes


If you are interested in receiving a quote for ByteGrid, please try our free quote service.

Related News
» More Bloom for Equinix
» Cloudflare CEO Says Company Could Not Remain "Neutral" as it Bans Daily Stormer
» IBM CEO Says Trump Advisory Forum Could No Longer Serve Purpose
» London Maintains Lead in Private Data Plumbing Ahead of Brexit
» Bloom’s Breakthrough Moment? Equinix to Install 40 MW of Fuel Cells

Copyright © Data Center Map - Sitemap
Your guide to colocation data centers, managed hosting, cloud servers etc.